Churu, the desert city like an oasis, situated in the middle
of the shifting golden sand dunes, opens the gate to the
great desert of Thar. Geographically, it lies in 28º
18' N latitude and 74º 58' E longitude. Churu has a
population of 1,01,874 as per 2001 census. Churu is a junction
station on Rewari-Bikaner railway line. The railway track
is meter gauge and is being converted to broad gauge. Churu
lies on NH 65 and is connected to all major cities by all-weather
roads. The town gets drinking water from local wells which
are hard and brackish. In the town, area drinking water
supply is managed by water dept. of Govt. of Rajasthan.
The Govt. is trying to get drinking water for the area from
Indira Canal. The main source of irrigation for farmers
continues to be rain water and wells at a few places.
To improve infrastructure facilities in the city, proposals
for augmentation of Water Supply, Sewerage, etc. of worth
88.48 crores have been tentatively identified by line agency
concerned/District Administration. District Collector is
working for identifying the total likely investments based
on the priority work and deficiencies in the infrastructure
sectors in consultation with public representatives including
other infrastructure development work like solid waste management,
road connectivity, bridges, drainage and development of
water bodies work etc.
The various works proposed in Churu are as follows:
|
Salasar ji

Tal
Chhapar
|
The population of City as per Census Report is as under:-
|
S.No. |
Year |
Population |
Growth Rate % |
|
1. |
1971 |
53,185 souis |
27.46 |
|
2. |
1981 |
62,070 souls |
16.71 |
|
3. |
1991 |
82.852 souls |
33.48 |
|
4. |
2001 |
1,01,874 souls |
|
To improve infrastructure facilities in the city,
proposals for augmentation of Water Supply (Rs. 27.60 Crores),
Sewerage (Rs 35.00 Crores), Urban Transport and Roads(Rs 22.63
Crores),Solid Waste management (Rs 2.00 Crores) and Social Infrastructure(Rs
1.25 Crores)has been identified by concerned line agency / District
Administration. Total cost is Rs.88.48 Crores. District
Collector is working for identifying the total likely investments
based on the priority works and deficiencies in the infrastructure
sectors in consultation with public representatives including
other
infrastructure development works like
Solid Waste Management, road connectivity, Bridges,
Drainage and Development of Water Bodies works etc.
|